Once all designs and plans are approved and you’ve approved our proposal and signed the contract, it’s time for the build to get started.
This will start with the site and foundation and includes any demolition works (as required), preparing the land for construction, measuring
the design, laying the foundation, pouring the footings and installing under slab drainage and moisture barriers.
Next comes building the frame and external walls, adding the roof, cladding and insulation. Subcontractors such as electricians and plumbers
are engaged to install wiring and pipes. When doors and windows are installed, the construction is deemed waterproof and all trades can
conduct their work, such as tiling, carpets, lights and power points, cabinetry, kitchen, bathroom and laundry fit-outs, appliances
installed and painting.
At the end we will do a walkthrough together to check everything is working and if there’s any issues to be addressed and fixed.